Problem Breakdown
We are given two arrays representing jobs (difficulty, profit) and an array of workers with specific ability levels. Each worker can perform at most one job, provided the job’s difficulty is less than or equal to their ability level. Crucially, a single job type (defined by its index) can be performed multiple times across different workers; however, for any given assignment instance, we want to maximize profit per worker.
Inputs:
difficulty: List of integers representing the skill required for each job.profit: Corresponding list of integer profits for those jobs.worker: List of integers representing ability levels of available workers.
Output:
- A single integer: The maximum total profit achievable by optimally assigning all possible work to the workforce.
Intuition
A brute-force approach would iterate through every worker and check every job to find the highest-paying one they can perform. This results in a time complexity of , where is the number of workers and is the number of jobs. Given constraints up to 10,000 for both arrays, this could reach operations per test case, which risks Time Limit Exceeded (TLE).
Key Insight: If a worker can perform Job A with difficulty , they might also be able to perform any job with difficulty . Since we want the maximum profit for that ability level, it doesn’t matter if there are multiple jobs available; only the one yielding the highest profit among all reachable difficulties matters.
This suggests a monotonic property: as worker ability increases, the set of accessible jobs grows (or stays same), and the maximum achievable profit is non-decreasing with respect to difficulty thresholds. By sorting both the job list by difficulty and the workers by ability, we can use two pointers or a linear scan approach where we maintain a running max_profit for all jobs encountered so far that are within reach of the current worker’s ability.
Approach
- Combine Data: Zip
difficultyandprofitinto pairs to keep them synchronized during sorting. - Sort Jobs: Sort these job pairs by difficulty in ascending order. This allows us to process jobs from easiest to hardest.
- Pre-process Profits (Implicit): As we iterate through the sorted workers, for each worker’s ability level, there might be multiple jobs they can do. We want the best one available up to that point. Instead of storing a complex lookup table, we maintain a
current_max_profitvariable while advancing our pointer in the job list. - Sort Workers: To utilize two pointers efficiently (linear scan), sort the workers by ability ascending as well. This ensures that when we move from one worker to the next with higher or equal ability, we only need to advance through the sorted job list once more; we never look back at lower-difficulty jobs because their profit potential is already captured in our running maximum.
- Two Pointers Logic:
- Initialize
job_idx= 0 andcurrent_max_profit= 0. - Iterate through each worker (sorted).
- While the job at
job_idxhas difficulty current worker’s ability: updatecurrent_max_profitwith that job’s profit, then incrementjob_idx. This ensurescurrent_max_profitholds the highest pay for any job within this worker’s capability. - Add
current_max_profitto total result (if no jobs are reachable yet, it remains 0).
- Initialize
Complexity Analysis
- Time Complexity: , where is the number of jobs and is the number of workers. This comes from sorting both arrays. The subsequent linear scan using two pointers takes . Given constraints (), this fits well within typical time limits (usually ops/sec).
- Space Complexity: Python’s
sortedandzipcreate new lists, so technically auxiliary space is required to store the sorted job pairs. This is acceptable given memory constraints for inputs of size .
Solution
def maxProfitAssignment(difficulty: list[int], profit: list[int], worker: list[int]) -> int:
# Combine difficulty and profit into a single sorted structure by difficulty
jobs = sorted(zip(difficulty, profit))
# Sort workers to enable linear two-pointer traversal
workers_sorted = sorted(worker)
total_profit = 0
current_max_profit = 0
job_idx = 0
n_jobs = len(jobs)
for w in workers_sorted:
# Advance the job pointer as long as the worker can handle the difficulty
while job_idx < n_jobs and jobs[job_idx][0] <= w:
current_max_profit = max(current_max_profit, jobs[job_idx][1])
job_idx += 1
# Add the best profit available for this ability level (or 0 if none)
total_profit += current_max_profit
return total_profit
# Example usage matching problem description:
# difficulty = [2,4,6,8,10], profit = [10,20,30,40,50], worker = [4,5,6,7]
# Output should be 100.
Edge Cases Handled
- Worker Ability < Minimum Job Difficulty: The
whileloop condition fails immediately (jobs[job_idx][0] <= wis false), leavingcurrent_max_profitat its initial value of 0, correctly adding to the total for that worker. - Duplicate Difficulties/Profits: Sorting handles duplicates naturally; if multiple jobs have same difficulty but different profits, we take the max during the loop iteration before moving past them or updating
current_max_profit. If a higher profit job appears later with equal difficulty (impossible in stable sort of pairs unless explicitly handled), our logic ensures we capture the highest seen so far. - Empty Inputs: Constraints state lengths , but if they were empty, loops would not execute and return correctly.
- Large Profits/Summation: Python handles arbitrary precision integers automatically, preventing overflow issues common in fixed-width integer languages like C++ or Java for this specific problem’s constraints (, fits in standard int anyway).